Scope of Work
Kitchen renovation
- Client
- [Client name]
- Contractor
- [Contractor name]
1. Project SummaryExample wording, replace it
Renovate the existing kitchen at [property address]: remove the current cabinets, countertops and flooring, and install new ones in the same layout. The result is a finished, working kitchen, ready to use on the completion date below.
2. Work IncludedExample wording, replace it
- Protect floors and adjoining rooms, and set up dust barriers
- Remove and dispose of the existing cabinets, countertops, sink and flooring
- Install [number] base and wall cabinets, [brand and model], per the attached layout
- Install [material] countertops with one undermount sink cutout
- Install [material] flooring, about [area] square feet
- Reconnect the sink plumbing, dishwasher and range in their current locations
- Patch and paint the walls disturbed by the work, one color
- Daily cleanup and final haul-away of all debris
3. Work Not IncludedExample wording, replace it
- Moving plumbing, gas or electrical lines to new locations
- New appliances, and repairs to existing appliances
- Repairing hidden damage found after demolition, such as rot, mold or faulty wiring
- Asbestos or lead testing and removal
- Painting outside the kitchen
- Window, door or structural changes
4. Schedule and MilestonesExample wording, replace it
| Milestone | Length |
|---|---|
| Site protection and demolitionWeek 1 | 1 week |
| Cabinets installedWeek 2 | 1 week |
| Countertops measured, made and installedWeeks 3 to 4 | 2 weeks |
| Flooring, plumbing reconnection and paintWeek 5 | 1 week |
| Walkthrough and punch listWeek 6 | 1 week |
| Total duration | 6 weeks |
5. Price and Payment ScheduleExample wording, replace it
| Payment | Share |
|---|---|
| Deposit at signing | 10% |
| When cabinets are installed | 40% |
| When countertops are installed | 30% |
| Final payment, when the punch list is closed | 20% |
| Total | 100% |
Invoices are due within [number] days. Payments follow finished milestones, not calendar dates.
6. Assumptions and Site ConditionsExample wording, replace it
- The work area is cleared of personal items before the start date
- Water and electricity are available on site at no cost to the contractor
- Work happens on weekdays between 8 a.m. and 5 p.m.
- The existing subfloor, framing, plumbing and wiring are sound
- The client chooses finishes and colors by [date] so materials arrive on time
7. Materials and PermitsExample wording, replace it
The contractor supplies all materials listed above. The client supplies [items, if any].
The contractor obtains the [permit type] permit and schedules the inspections. Permit fees are [included in the price or billed at cost].
8. Change OrdersExample wording, replace it
Any change to the work, the materials, the price or the schedule is written up as a change order before that work begins. The change order describes the change, the price difference and the effect on the completion date, and both parties sign it.
Work outside this scope is not done, and not billed, without a signed change order.
9. Completion and AcceptanceExample wording, replace it
- All work listed above is complete and matches the attached layout and selections
- Cabinet doors and drawers open, close and line up
- Plumbing connections are tested and do not leak
- Required inspections are passed
- Both parties walk the job together and agree a written punch list. The job is complete when every item on it is closed
10. Sign-Off
Both parties agree to the scope of work described above.
Client
Contractor