Scope of Work Template

Pick the type of project, replace the example wording with your own, and print or save a clean scope of work as a PDF. There is no download and no account, and nothing you type leaves your browser.

Your details

Each type sets the section headings and fills in example wording. Text you have rewritten stays when you switch.

Jump to your document

Parties and Project

Who is doing the work and who it is for. Use the names that will sign.

Address, phone or email.

Address, phone, email or license number.

Project Summary

Two or three sentences: what is being done, where, and what the finished result is.

Work Included

Everything the price covers, one item per line. Write things a stranger could check off: quantity, model, size, location.

One item per line.

Work Not Included

What the price does not cover, one item per line. List whatever a reasonable client might assume is included.

One item per line.

Schedule and Milestones

The steps in order and how long each takes. Add a start date to turn the schedule into calendar dates.

Optional. A date such as 03/15/2027 turns the schedule into calendar dates.

Milestone lengths are in

Price and Payment Schedule

The total price and when each part is due. Tie payments to finished milestones where you can.

Leave at 0 to show each payment as a share of the price.

Due dates, late fees, what is billed separately.

Assumptions and Site Conditions

What you are counting on to be true. If one turns out false, the price or the dates change through the change process.

One item per line.

Materials and Permits

Details that are specific to this kind of project.

Leave empty to drop this section.

Change Orders

How a change is requested, priced and approved. This is the clause that settles the argument about extra work.

Completion and Acceptance

The tests that show the work is finished, one per line. Each should have a yes or no answer.

One test per line.

Sign-Off

Signature, printed name and date lines for both parties.

Signature, printed name and date for both parties.

Your document

Scope of Work

Kitchen renovation

Client
[Client name]
Contractor
[Contractor name]

1. Project SummaryExample wording, replace it

Renovate the existing kitchen at [property address]: remove the current cabinets, countertops and flooring, and install new ones in the same layout. The result is a finished, working kitchen, ready to use on the completion date below.

2. Work IncludedExample wording, replace it

  • Protect floors and adjoining rooms, and set up dust barriers
  • Remove and dispose of the existing cabinets, countertops, sink and flooring
  • Install [number] base and wall cabinets, [brand and model], per the attached layout
  • Install [material] countertops with one undermount sink cutout
  • Install [material] flooring, about [area] square feet
  • Reconnect the sink plumbing, dishwasher and range in their current locations
  • Patch and paint the walls disturbed by the work, one color
  • Daily cleanup and final haul-away of all debris

3. Work Not IncludedExample wording, replace it

  • Moving plumbing, gas or electrical lines to new locations
  • New appliances, and repairs to existing appliances
  • Repairing hidden damage found after demolition, such as rot, mold or faulty wiring
  • Asbestos or lead testing and removal
  • Painting outside the kitchen
  • Window, door or structural changes

4. Schedule and MilestonesExample wording, replace it

MilestoneLength
Site protection and demolitionWeek 11 week
Cabinets installedWeek 21 week
Countertops measured, made and installedWeeks 3 to 42 weeks
Flooring, plumbing reconnection and paintWeek 51 week
Walkthrough and punch listWeek 61 week
Total duration6 weeks

5. Price and Payment ScheduleExample wording, replace it

PaymentShare
Deposit at signing10%
When cabinets are installed40%
When countertops are installed30%
Final payment, when the punch list is closed20%
Total100%

Invoices are due within [number] days. Payments follow finished milestones, not calendar dates.

6. Assumptions and Site ConditionsExample wording, replace it

  • The work area is cleared of personal items before the start date
  • Water and electricity are available on site at no cost to the contractor
  • Work happens on weekdays between 8 a.m. and 5 p.m.
  • The existing subfloor, framing, plumbing and wiring are sound
  • The client chooses finishes and colors by [date] so materials arrive on time

7. Materials and PermitsExample wording, replace it

The contractor supplies all materials listed above. The client supplies [items, if any].

The contractor obtains the [permit type] permit and schedules the inspections. Permit fees are [included in the price or billed at cost].

8. Change OrdersExample wording, replace it

Any change to the work, the materials, the price or the schedule is written up as a change order before that work begins. The change order describes the change, the price difference and the effect on the completion date, and both parties sign it.

Work outside this scope is not done, and not billed, without a signed change order.

9. Completion and AcceptanceExample wording, replace it

  • All work listed above is complete and matches the attached layout and selections
  • Cabinet doors and drawers open, close and line up
  • Plumbing connections are tested and do not leak
  • Required inspections are passed
  • Both parties walk the job together and agree a written punch list. The job is complete when every item on it is closed

10. Sign-Off

Both parties agree to the scope of work described above.

Client

Signature
Printed name
Date

Contractor

Signature
Printed name
Date
  • Add both party names before you send or sign this.
  • 9 sections still hold example wording. They are labeled in the document. Replace the wording before you send this. The labels are not printed.

Save your scope of work

Nothing is uploaded. Your text is kept in this browser only, so it is still here when you come back. This is a general template, not legal advice.

How the dates and amounts are worked out

Milestones run one after another. Without a start date, each one is shown as a range of weeks or days counted from the start. With a start date, the first milestone begins on that day and each one ends the day before the next begins. A week is seven calendar days, and weekends and holidays are not skipped.

Each payment is its share of the total price, rounded to the cent. When the shares add up to 100%, the last payment takes whatever is left, so the amounts always add up to the price exactly. If they do not add up to 100%, a note says so.

Scope of work example: a website project

This is a complete scope of work made with the website preset. It has 9 numbered sections plus sign-off lines: what is included, what is out of scope, 5 milestones over 7 weeks from Jan 11, 2027, a payment schedule, assumptions, a change process and acceptance criteria. The $10,000 price is a round number chosen to show the math, split $4,000, $3,000, $3,000. The wording is an example to overwrite, and the names in brackets are left for you to fill in.

Scope of Work

New company website

Client
[Client name]
Provider
[Provider name]

1. Project Summary

Design and build a new website that explains the client's services and turns visitors into inquiries. The new site replaces the current one at [domain] and launches on the client's existing domain.

2. Deliverables

  • Site plan and page list, approved before design starts
  • Design for the home page and one inner page, with two rounds of revisions
  • Up to [number] pages built from the approved design, for phone, tablet and desktop
  • Contact form that emails inquiries to [email address]
  • Search basics: page titles, descriptions, a sitemap and redirects from the old page addresses
  • Analytics installed, with inquiries tracked as a goal
  • Launch on the client's domain, and a one-hour recorded handover session

3. Out of Scope

  • Writing the page text and sourcing photos, beyond light editing of text the client supplies
  • Logo design and brand identity work
  • Online store, booking system, member login or other custom features
  • Hosting, domain and email fees
  • Search marketing, ads and new content after launch
  • Changes asked for after the two revision rounds or after launch, which go through the change process below

4. Timeline and Milestones

Start date: Jan 11, 2027

MilestoneLength
Site plan and content checklistJan 11 to Jan 17, 20271 week
Design and revisionsJan 18 to Jan 31, 20272 weeks
BuildFeb 1 to Feb 14, 20272 weeks
Client review and fixesFeb 15 to Feb 21, 20271 week
Launch and handoverFeb 22 to Feb 28, 20271 week
Planned completion: Feb 28, 20277 weeks

5. Price and Payment Schedule

Total price: $10,000

PaymentAmount
At signing40% of the price$4,000
On design approval30% of the price$3,000
On launch30% of the price$3,000
Total$10,000

Invoices are due within [number] days. The client pays hosting and other third-party fees directly.

6. Assumptions

  • The client supplies all text, photos and logo files by the end of the first week
  • One person on the client side collects feedback and approves each stage
  • Feedback arrives within [number] business days of each review request. Later feedback moves the launch date by the same amount
  • The client provides logins for the domain, the hosting and any existing analytics

7. Content, Access and Ownership

The client provides the content and account access listed under assumptions.

On final payment the client owns the finished site, its design files and its content. Third-party items such as fonts, stock photos, themes and plugins stay under their own licenses.

8. Change Process

A request outside this scope is written down as a change request. The provider replies with the cost and the effect on the launch date, and starts the work only after the client approves that reply in writing.

Fixes to work already in this scope are not change requests.

9. Acceptance Criteria

  • Every page on the approved page list is live on the client's domain
  • Pages display correctly in the current versions of Chrome, Safari, Edge and Firefox, on phone and desktop
  • The contact form delivers a test inquiry to the agreed address
  • Old page addresses redirect to the matching new pages
  • The client has [number] business days after delivery to report defects against this list. The site is accepted when those are fixed, or when that period ends with none reported

10. Sign-Off

Both parties agree to the scope of work described above.

Client

Signature
Printed name
Date

Provider

Signature
Printed name
Date

What a scope of work is

A scope of work is a written description of a job: what will be done, what will not, when it happens, what it costs and how both sides will know it is finished. It is agreed before the work starts, by the person paying and the person doing the work. Its purpose is simple: three months in, nobody has to rely on what they remember being said.

What each section is for

  • Parties and project. Who does the work, who it is for, and a name for the job that both sides will use.
  • Summary. Two or three sentences a new reader can understand without the rest of the document.
  • Deliverables. Everything the price covers, written so that each item can be checked off.
  • Out of scope. What the price does not cover, especially anything the client might assume is included.
  • Timeline and milestones. The steps in order, how long each takes, and the start and end dates once they are known.
  • Price and payment schedule. The total, and what is due at which milestone.
  • Assumptions. What you are counting on, such as site access, content arriving on time or one person approving the work.
  • Change process. How a change is asked for, priced and approved before anyone starts on it.
  • Acceptance criteria. The tests that decide the work is done, each with a yes or no answer.
  • Sign-off. Signature, printed name and date for both parties.

Each preset also has one section of its own: materials and permits for construction, service standards for a service contract, content and ownership for a website, hosting and warranty for software, approvals and reporting for marketing.

Scope of work vs statement of work

The two names overlap, and both are shortened to SOW. In everyday project-management usage, the scope of work is the narrower one. Asana defines it as the document that "defines the specific tasks, deliverables, and timeline for a project", and describes it as "typically a section within the larger statement of work", which adds the contract side: costs, schedules and legal terms.

Public purchasing uses the words differently. NIGP, the institute for public procurement, describes a scope of work as the description of needs and desired outcomes that goes to potential suppliers, and a statement of work as the version agreed with the supplier that is chosen. It also says the two phrases "have been used interchangeably, inconsistently, or in contradictory ways for a long time".

So do not argue about the title. If a client asks for a statement of work, ask which parts they expect, and use this template with the payment, change and acceptance sections filled in.

Three mistakes that cause disputes

Missing exclusions

A list of deliverables says what is included. It says nothing about what the client assumes comes with it: the painting outside the kitchen, the text for the website, the phone app that goes with the web app. Write those down as out of scope while everyone is still friendly. The Federal Trade Commission's advice to homeowners makes the same point from the other side: a contract should include "any promises made during conversations or calls related to issues such as the scope of work".

No change process

Almost every job changes after it starts. Without a written rule, extra work gets done on a spoken yes, and the argument comes with the invoice. A change process needs four things: the change in writing, its price, its effect on the dates, and approval from both sides before the work begins. California's Contractors State License Board tells homeowners to record changes, with any price adjustment, on a change order, and says that "after a change order is signed, it becomes part of the written contract".

Vague acceptance

"Complete to the client's satisfaction" cannot be tested. "The contact form delivers a test inquiry to the agreed address" can. Write each acceptance test so that it has a yes or no answer, and say how long the client has to check the work. The same goes for the deliverables: the California board's example of a line that is too vague is "install kitchen cabinets", with nothing about which ones.

Deposits and final payment

Tying payments to finished milestones gives both sides a reason to keep going. The Federal Trade Commission tells homeowners to "never make the final payment until the work is done and you're satisfied with it", which is what the acceptance section is for. Rules on deposits vary by state. California, for example, limits the down payment on a home improvement contract to 10 percent of the price or $1,000, whichever is less. Check the rules where the work is done before you set the first payment.

How the dates and amounts are worked out

Milestones run one after another. Without a start date, the schedule is shown in weeks or days counted from the start. With one, each milestone gets calendar dates, counting seven calendar days to a week and skipping no weekends or holidays. Each payment is its percentage of the total price, and when the percentages add up to 100 the last payment takes the remainder, so the amounts add up to the price exactly.

Open the template on a preset

Add the project type to the address to start from it: ?preset=construction, service, website, software, marketing or blank. Text you have already rewritten is kept when the preset changes.

A template, not legal advice

This is a general template and the example wording is there to be replaced. It is not legal advice and it is not a full contract. For a job with real money or risk attached, have a lawyer in your state read the final document.

If the project is a website or an app

Those are the two things on this page that we build ourselves: websites for local businesses and custom business apps and automations.

Common Questions

What is the difference between a scope of work and a statement of work?

A scope of work describes the work itself: the tasks, the deliverables, what is left out and the timeline. A statement of work is the wider agreement around it, which adds things such as the price, the payment terms and the legal conditions. Asana describes the scope of work as typically a section within the larger statement of work. People use the two names loosely and both are shortened to SOW, so go by what the document is asked to contain, not by its title.

What should a scope of work include?

The parties, a short summary, the deliverables, what is out of scope, the timeline and milestones, the price and payment schedule, the assumptions, how changes are handled, how the work is accepted, and signature lines. This template has all ten, and it leaves out any section you keep empty.

How detailed should a scope of work be?

Detailed enough that someone who was not in the meetings could tell whether each item was done. Give quantities, models, sizes and locations instead of general words. California's contractor board gives the example of a contract that says only to install kitchen cabinets, and advises being as specific as possible about the materials to be used.

Can a scope of work be changed after the project starts?

Yes, when both sides agree. Write the change down with its effect on the price and the dates, and have both parties approve it before the extra work starts. For home improvement jobs, California's contractor board says a signed change order becomes part of the written contract. The change section of this template sets that process up before anyone needs it.

Is a scope of work the same as a contract?

No. A scope of work describes the job. A contract also holds the legal terms, such as liability, warranties, insurance, ending the agreement and settling disputes. A scope of work is often attached to a contract or referred to by one. This template is a general starting point and not legal advice, so have a lawyer read anything with real money or risk attached.

Is this scope of work template really free?

Yes. There is no sign-up, no email field and no file to download. The document is built in your browser, your text is stored only in that browser, and you keep it with the Print or save as PDF button.

Can I edit the scope of work in Word or Google Docs?

Yes. Use Copy as text and paste it into Word, Google Docs or an email, or download it as a text file. For a finished, formatted copy, use Print or save as PDF.

Build Plan and Fixed Quote

Get the plan and one fixed price before you pay to build

We look at how the work runs today and tell you plainly what is worth building, what a ready-made product or a simple automation would cover, where an AI agent would help and what to leave alone. You get it in writing, with a fixed price for the first build, so you know the full number before any work begins. The plan is yours to keep, whether we build it, someone else does, or nobody does.

  • A short questionnaire about how the work runs today, reviewed before we talk. If you already wrote a scope of work, we start from it
  • A one-hour call that walks through the work you want off your plate
  • A written plan that says for each part: build it, buy a ready-made product, automate it, hand it to an AI agent, or leave it alone
  • What the recommended setup would cost to build and to run every month
  • A fixed-price proposal for the first build, with scope, timeline and deliverables, valid for 30 days
$495one time

Turnaround: Written plan within 5 business days of your call.

You pay on Stripe's secure checkout page. We never see your card number.