Paver Calculator

Enter the size of the patio, walkway or driveway and the size of your pavers. You get the number of pavers to order with extra for cuts, plus the gravel base and bedding sand in cubic yards and tons.

Shape of the patio, walkway or driveway

Nominal sizes. Measure your paver and pick Another size if it differs.

Leave at 0 when the size already allows for the joint.

10% for straight patterns, 15 to 20% for herringbone or curves.

At least 4 for a patio or walkway, 6 for a driveway.

1 inch is the standard.

Loose gravel shrinks when compacted. Ask your supplier how much to add.

Leave any price at 0 to leave it out of the cost.

Printed on the saved result.

Paver estimate

Your paver order

Pavers to order

951 pavers

4 x 8 in pavers for 192 sq ft, including 10% extra for cuts and breakage. Without the extra: 864.

Pavers per square foot

4.5

Area

192 sq ft

Gravel base

3.2 tons

Bedding sand

0.77 tons

Materials
MaterialQuantity
Pavers4 x 8 in, 0 in joint, 0.2222 sq ft each951
Gravel base4 in deep, 2.37 cu yd at 1.35 tons per cu yd3.2 tons
Bedding sand1 in deep, 0.59 cu yd at 1.3 tons per cu yd0.77 tons
How we calculated this

Pavers. One paver covers its length plus the joint, times its width plus the joint, in inches, divided by 144 to get square feet. The area divided by that, with your extra percentage added, is rounded up to a whole paver. The starting value of 10% extra is what the manufacturer Western Interlock advises for straight-lay patterns. It advises 15 to 20% for diagonal, herringbone or curved layouts.

Gravel base. Area times base depth in feet gives cubic feet. Divide by 27 for cubic yards. The Concrete Masonry and Hardscapes Association gives a minimum base, after compaction, of 4 inches for patios and walkways and 6 inches for residential driveways, on well-drained soil. Tons use 1.35 tons per cubic yard unless you change it: the loose weight Caltrans publishes for crushed gravel (2,700 lb).

Bedding sand. Same volume math at the sand depth. The association gives a nominal 1 inch, screeded and not compacted. Tons use 1.3 tons per cubic yard unless you change it: the upper end of the 2,400 to 2,600 lb range Caltrans publishes for sand.

What this is not. Loose gravel takes up less room once it is compacted, so you need more than the finished depth suggests. The compaction allowance starts at 0 because it depends on the material: ask your supplier and enter it. Joint sand, edge restraint and labor are not included.

Save your result

Example: a 16 by 12 foot patio in 4 x 8 pavers

A patio that is a 16 ft x 12 ft rectangle covers 192 square feet. In 4 by 8 inch pavers that is 4.5 pavers per square foot, so 864 pavers, or 951 with 10% extra for cuts. A 4-inch gravel base takes 2.37 cubic yards (3.2 tons) and a 1-inch sand bed takes 0.59 cubic yards (0.77 tons), before any allowance for compaction.

Example paver order

Pavers to order

951 pavers

4 x 8 in pavers for 192 sq ft, including 10% extra for cuts and breakage. Without the extra: 864.

Pavers per square foot

4.5

Area

192 sq ft

Gravel base

3.2 tons

Bedding sand

0.77 tons

Materials
MaterialQuantity
Pavers4 x 8 in, 0 in joint, 0.2222 sq ft each951
Gravel base4 in deep, 2.37 cu yd at 1.35 tons per cu yd3.2 tons
Bedding sand1 in deep, 0.59 cu yd at 1.3 tons per cu yd0.77 tons
How we calculated this

Pavers. One paver covers its length plus the joint, times its width plus the joint, in inches, divided by 144 to get square feet. The area divided by that, with your extra percentage added, is rounded up to a whole paver. The starting value of 10% extra is what the manufacturer Western Interlock advises for straight-lay patterns. It advises 15 to 20% for diagonal, herringbone or curved layouts.

Gravel base. Area times base depth in feet gives cubic feet. Divide by 27 for cubic yards. The Concrete Masonry and Hardscapes Association gives a minimum base, after compaction, of 4 inches for patios and walkways and 6 inches for residential driveways, on well-drained soil. Tons use 1.35 tons per cubic yard unless you change it: the loose weight Caltrans publishes for crushed gravel (2,700 lb).

Bedding sand. Same volume math at the sand depth. The association gives a nominal 1 inch, screeded and not compacted. Tons use 1.3 tons per cubic yard unless you change it: the upper end of the 2,400 to 2,600 lb range Caltrans publishes for sand.

What this is not. Loose gravel takes up less room once it is compacted, so you need more than the finished depth suggests. The compaction allowance starts at 0 because it depends on the material: ask your supplier and enter it. Joint sand, edge restraint and labor are not included.

How many pavers do I need?

Divide the area of the project by the area of one paver, then add extra for the pieces you will cut. Both areas have to be in the same unit, so turn the paver's size from inches into square feet by dividing by 144.

Written out:

  • Paver area in square feet = length in inches x width in inches / 144.
  • Pavers for the bare area = project square feet / paver area.
  • Pavers to order = that number x (1 + extra percent / 100), rounded up.

A worked example

A patio is 16 feet by 12 feet, so 192 square feet. A 4 by 8 inch paver is 32 square inches, and 32 / 144 is 0.222 square feet, which works out to 4.5 pavers per square foot. 192 x 4.5 is 864 pavers for the bare area. With 10% extra for cuts, the order is 951 pavers.

The base is 4 inches of compacted gravel: 192 square feet x (4 / 12) feet is 64 cubic feet, and 64 / 27 is 2.37 cubic yards. At 1.35 tons per cubic yard that is 3.2 tons, before any allowance for compaction. The bedding sand is 1 inch: 192 / 12 is 16 cubic feet, or 0.59 cubic yards, which is 0.77 tons at 1.3 tons per cubic yard.

The base and the sand

A paver surface is only as flat as what is under it. The Concrete Masonry and Hardscapes Association, the trade body that publishes the installation guidance for interlocking concrete pavers, gives these minimums on well-drained soil:

  • Patios, walkways and pedestrian areas: a base of at least 4 inches after compaction.
  • Residential driveways: a base of at least 6 inches.
  • Bedding sand: a nominal 1 inch, screeded and left uncompacted until the pavers are set.

The base depths are compacted depths. Gravel is delivered loose and shrinks when it is compacted, so the loose volume you order is larger than the finished volume. How much larger depends on the material, and none of the sources behind this calculator gives a percentage, so the compaction allowance starts at zero. Ask your supplier what to allow for their base material and enter it.

The tons come from published loose weights: 2,700 pounds per cubic yard for crushed gravel and 2,400 to 2,600 pounds per cubic yard for sand, both from a Caltrans table. The calculator uses the upper sand figure. If your supplier gives you its own tons per cubic yard, replace either number. For gravel by type, bags and a price per yard, use the gravel calculator.

How much extra to order

Every edge of a patio ends in cut pavers, and the offcuts are often too small to use. Western Interlock, a paving stone manufacturer, advises 10% extra for straight-lay patterns and 15 to 20% for diagonal, herringbone or curved layouts. The calculator starts at 10%.

What the count leaves out

The result covers pavers, base gravel and bedding sand. It does not include joint sand, edge restraint, geotextile or labor. Add those to your estimate as their own lines.

Pricing the job

Enter a price per paver and prices per ton for gravel and sand, and the result adds up the material cost. For a patio that is not a simple rectangle, total the area with the square footage calculator and choose "I know the area" here. If you quote patios and walkways every week, the offer below puts this math on your own website as a quote form customers can fill in.

Common Questions

How many pavers do I need?

Divide the area in square feet by the area of one paver in square feet, then add extra for cuts. A 16 by 12 foot patio is 192 square feet, and a 4 by 8 inch paver covers 0.222 square feet, so the patio takes 864 pavers. With 10% extra, order 951.

How many pavers are in a square foot?

Divide 144 by the paver's length times its width in inches. That gives 4.5 pavers per square foot for 4 by 8 inch pavers, 4 for 6 by 6, 2.67 for 6 by 9, 2.25 for 8 by 8 and 1 for 12 by 12.

How many pavers do I need for a 10x10 patio?

A 10 by 10 foot patio is 100 square feet. That is 450 pavers of 4 by 8 inches, 400 of 6 by 6 inches or 100 of 12 by 12 inches, before extra for cuts. With 10% extra, order 495, 440 or 110.

How deep should the gravel base be under pavers?

The Concrete Masonry and Hardscapes Association gives a minimum base, after compaction, of 4 inches for patios, walkways and other pedestrian areas and 6 inches for residential driveways, both on well-drained soil. That guidance is for well-drained soil, so check local practice if yours is not.

How much sand do I need under pavers?

The association's guidance is a nominal 1 inch of bedding sand, screeded and not compacted. For 100 square feet that is 8.33 cubic feet, or 0.31 cubic yards. The calculator turns that into tons using the weight Caltrans publishes for sand, which you can change.

How many extra pavers should I order?

The manufacturer Western Interlock advises adding 10% for straight-lay patterns such as running bond or stack bond, and 15 to 20% for diagonal, herringbone or curved layouts. The extra covers cut pieces at the edges and the odd broken paver.

Does the joint between pavers change the count?

Slightly. Many concrete pavers are sold by a nominal size that already allows for the joint, so leave the joint at 0 for those. If you set natural stone or brick with a wider gap, enter the gap and the calculator adds it to each paver's length and width before counting.

Online Quote Form Setup

Let your website write the quote

You just worked out a price by hand. This puts your price list to work on your website: a customer answers a few questions, the form works out the price from your own rates, and they get an itemized quote by email while you get the request. We set it up from your price list and host it for you, so there is no monthly fee to us.

  • One quote request form for your business, with up to 10 questions and up to 15 priced items or options from your own price list
  • The price worked out from your rates the moment the customer submits, with no reply needed from you
  • An itemized quote emailed to the customer in your business name and colors, and an alert to you with every answer
  • Every request saved to a Google Sheet that you own
  • Added to your current website as an embed or a button, or delivered as its own page, with one round of changes
$395one time

Turnaround: Live within 5 business days of getting your price list and logo.

You pay on Stripe's secure checkout page. We never see your card number.