Estimate Template

Enter the job, the line items and how far the final cost could move, and get a clear estimate that says plainly it is an estimate. Save it as a PDF or print it, with no account and nothing uploaded.

Trade

Fills in example line items and terms. They are placeholders, not market prices: overwrite every one with your own.

Your business

Remembered in this browser for next time. Nothing you type here is uploaded or sent anywhere.

Customer

Estimate details

How long you will hold these figures. Clear it to leave the line off.

Printed under the job title. Leave it empty to leave it off.

Line items

Quantity times unit price, rounded to the cent on each line. Start a description with "Labor:" or "Parts:" and the document adds a subtotal for each.

Line 1

Line total $1,200.00

Line 2

Line total $2,600.00

Line 3

Line total $1,850.00

Line 4

Line total $2,400.00

Discount, tax and deposit

All optional. Leave them off and the document shows a plain total.

Leave at 0 for no tax line. Rates and what is taxable depend on your state and city.

Some states limit the deposit a contractor may ask for. Check the rule where you work.

Prints an expected range around the estimated total. Leave at 0 to show one figure.

Terms and notes

A starting point in plain words, not legal advice. Edit it to match how you work and the rules in your state.

Prints a place for the customer to sign and date to go ahead.

Save your estimate

5 lines still say "Example". The example descriptions and prices are placeholders, not market rates. Replace them with your own before you send this.

Your business name

Estimate

No.
E-1001

Prepared for

Customer name

Job

Example: Kitchen remodel

Line items
DescriptionAmount
Example: Demolition and haul-away1 x $1,200.00$1,200.00
Example: Framing and drywall, labor (per hour)40 x $65.00$2,600.00
Example: Materials: lumber, drywall, fasteners1 x $1,850.00$1,850.00
Example: Finish carpentry and paint1 x $2,400.00$2,400.00
Subtotal
$8,050.00
Estimated total
$8,050.00

Terms

This estimate is our best approximation of the cost, based on the information available today. It is not a fixed price. If the scope or the site conditions change, we will tell you the new cost and get your approval before doing extra work. A fixed price and payment terms are confirmed in a written quote or contract before work starts. Permits are included only where listed. Changes to the scope are priced and approved in writing before the extra work starts.

How the totals are worked out

Each line is its quantity times its unit price, rounded to the cent. The subtotal is the sum of the lines.

A discount comes off the subtotal first. Tax is then charged on what is left of the lines marked taxable, so a discount lowers the tax too. The total is the subtotal, minus the discount, plus the tax.

A percentage deposit is a share of the total with tax included, and the balance is the total minus the deposit. The expected range is the total minus and plus the percentage you set. All the math is done in whole cents and half a cent rounds up.

Your estimate is built in this browser. Nothing is uploaded, and no account or email is needed.

Example: a filled-in construction estimate

This sample construction estimate has 4 line items that add up to $8,050.00. Tax at a sample rate of 6% is charged on the materials line only, which adds $111.00, so the estimated total is $8,161.00. With a range of plus or minus 10%, the customer is told to expect $7,344.90 to $8,977.10. Every name, price and rate in it is a placeholder that shows the layout, not a market rate.

Your Construction Company (sample)

100 Sample Street Your City, ST 00000 (555) 010-0100 office@example.com

License: Your license number

Estimate

No.
E-1001
Date:
November 17, 2026
Valid until:
December 17, 2026

Prepared for

Sample Customer

200 Example Avenue Your City, ST 00000 customer@example.com

Job

Example: Kitchen remodel

Line items
DescriptionAmount
Example: Demolition and haul-away1 x $1,200.00Not taxed$1,200.00
Example: Framing and drywall, labor (per hour)40 x $65.00Not taxed$2,600.00
Example: Materials: lumber, drywall, fasteners1 x $1,850.00$1,850.00
Example: Finish carpentry and paint1 x $2,400.00Not taxed$2,400.00
Subtotal
$8,050.00
Sales tax on materials (sample rate) (6%)
$111.00
Estimated total
$8,161.00
Expected range (plus or minus 10%)
$7,344.90 to $8,977.10

Terms

This estimate is our best approximation of the cost, based on the information available today. It is not a fixed price. If the scope or the site conditions change, we will tell you the new cost and get your approval before doing extra work. A fixed price and payment terms are confirmed in a written quote or contract before work starts. Permits are included only where listed. Changes to the scope are priced and approved in writing before the extra work starts.

Notes

Sample only. Every name, price and rate here is a placeholder to show the layout, not a market rate.

What an estimate is

An estimate is a written best guess at what a job will cost, made before all the facts are in. It tells the customer roughly what to budget and tells you both what was assumed. It is not a fixed price, and a good one says so in plain words.

What goes on an estimate

  • Your business. Name, address, phone, email and license number.
  • The customer and the job site. Who the estimate is for and where the work would happen.
  • A number and dates. An estimate number, the date, and how long the figures hold.
  • The work, line by line. Labor, materials, subcontractors, permits and disposal as separate lines with quantities, not one total.
  • The estimated total and its range. One figure, and how far above or below it the final cost could land.
  • Assumptions and terms. What you could not see, what you assumed about it, and that extra work needs approval first.

Give a range, not only a number

A single figure reads like a promise, whatever the heading says. Set "The final cost could vary by" and the template prints an expected range under the estimated total, for example plus or minus 10 percent. Choose the percentage from your own experience of similar jobs, and make it wider when more of the job is hidden. The tool does not suggest one, because the right figure depends on your trade and the job.

When an estimate should become a quote

Move to a quote when the unknowns are gone: you have opened the wall, measured the roof or priced the materials with your supplier. The quote template uses the same form with fixed-price wording and a line for the customer to sign. Sending the quote before work starts means the number the customer agreed to is the number on the invoice.

Common mistakes on estimates

  • Calling a fixed price an estimate, or the reverse. Pick the word that matches what you mean, and let the terms say the same thing.
  • No assumptions. If the estimate assumes sound framing or working shutoff valves, write it down. That sentence is what you point to when the price moves.
  • No allowance for what is likely. If rotted decking shows up on half your roofs, add an allowance line with a unit price so nobody is surprised.
  • Taxing every line the same without checking. A job often mixes labor and materials, and tax may not apply to both. Confirm it for your state, then set the tax switch line by line.
  • No expiry. Material prices move. Give the estimate a date it holds until.
  • Example text left in. The presets are placeholders. The tool counts the lines that still say "Example" before you send anything.

Tax differs by state and by line

There is no rate the template could safely assume. The Tax Foundation counts 45 states with a state-level sales tax and 38 that allow local sales taxes as well, so the rate depends on where the job is. Enter your rate, then switch tax on or off for each line. Ask your state's tax agency which lines of your kind of job are taxed: this page is not tax advice.

Estimate templates by trade

The builder on this page works for any business. These pages open the same builder already set up for one trade, each with its own line items, sample and notes on what customers of that trade look for:

To measure the job first, start with the square footage calculator.

If you give estimates every week

The first number a customer asks for is usually a ballpark, and it does not need you at a keyboard. A form on your own website can ask the questions you always ask and reply with a price built from your rates. The free Form Kit shows how one works and lets you build it yourself, and the offer below is the same thing set up for you.

Common Questions

What should an estimate include?

The Federal Trade Commission's advice to homeowners is that a written estimate should include a description of the work to be done, materials, completion date and the price. Around those four, add your business and license details, the customer and job address, an estimate number and date, how long the figures hold, what you assumed, and a plain statement that the final cost can change. This template has a field for each.

What is the difference between an estimate and a quote?

An estimate is your best approximation of the cost from what you know today, and it can move when the job turns out differently. A quote is a fixed price for a defined job. Give an estimate early, when the customer wants a ballpark or part of the job is hidden, and follow it with a quote once you can commit to a number.

Is an estimate legally binding?

An estimate is meant as an approximation, not a promise of a final price, and the terms in this template say so. That does not settle it everywhere: the FTC notes that contract requirements vary by state. Treat this as general information, not legal advice, and check the rules where you work.

How do I estimate a construction job?

Break the job into parts and price each one on its own line: labor as hours times your rate, materials at what they cost you plus your markup, subcontractors, equipment, permits and disposal. Add them up, then decide how far the total could move and why. Writing the assumptions down, such as existing framing being sound, is what lets you explain a change later.

Can the final price be higher than the estimate?

Yes, and that is the point of calling it an estimate. What keeps customers on your side is saying up front how much it could move, which the expected range does, and getting their approval in writing before you do work that was not in the estimate.

Does this work as a contractor or building cost estimate template?

Yes. The General contractor preset fills in example lines for demolition, labor by the hour, materials and finish work, and there are presets for roofing, plumbing, HVAC, electrical, landscaping, painting and cleaning, plus a blank one. Every example description and price is a placeholder to overwrite with your own, not a market rate.

How do I turn an estimate into a quote?

Once you have seen the whole job, open the quote template on this site. Your business details are already there, because both tools remember them in your browser. Enter the confirmed lines and price, set the date the price holds until, and send the quote for the customer to accept.

Online Quote Form Setup

Let your website write the quote

You just worked out a price by hand. This puts your price list to work on your website: a customer answers a few questions, the form works out the price from your own rates, and they get an itemized quote by email while you get the request. We set it up from your price list and host it for you, so there is no monthly fee to us.

  • One quote request form for your business, with up to 10 questions and up to 15 priced items or options from your own price list
  • The price worked out from your rates the moment the customer submits, with no reply needed from you
  • An itemized quote emailed to the customer in your business name and colors, and an alert to you with every answer
  • Every request saved to a Google Sheet that you own
  • Added to your current website as an embed or a button, or delivered as its own page, with one round of changes
$395one time

Turnaround: Live within 5 business days of getting your price list and logo.

You pay on Stripe's secure checkout page. We never see your card number.